Number: 1203667
Country: Tunisia
Source: TED
Construction on ‘ E.P.C. — Turn key bases’ of a production plant processing cellulosic biomass.
Construction on ‘ E.P.C. — Turn key bases’ of a production plant processing cellulosic biomass (Arundo Donax) designed to produce on two (2) ‘twin’ lines, 100.000 tons/year of Bio-Ethanol out-put.
Preparation of the impact studies and research activities to be undertaken by the current Tunisian rules and legislation
TUNISIA.
STUDIES AND RESEARCH ACTIVITIES TO BE UNDERTAKEN BY TUNISIAN RULES.
Agriculture activities to create a 12.500 Hectare dedicate culture of Arundo Donax
Agriculture activities to create a 12.500 Hectare dedicate culture of Arundo Donax.
Construction on ‘ E.P.C. — Turn key bases’ of a production plant processing cellulosic biomass (Arundo Donax) designed to produce on two (2) ‘twin’ lines, 100 000 tons/year of Bio-Ethanol out-put
Tunisia
El Hamma, Gabes.
Construction on ‘ E.P.C. — Turn key bases’ of a production plant processing cellulosic biomass (Arundo Donax) designed to produce on two (2) ‘twin’ lines, 100 000 tons/year of Bio-Ethanol out-put.
Construction on ‘ E.P.C. — Turn key bases’ of a production plant processing cellulosic biomass (Arundo Donax) designed to produce on two (2) ‘twin’ lines, 100.000tons/year of Bio-Ethanol out-put
Civil works — Process equipments — Electro/mechanical installation — others.